logo
 
banner

services


Projects

Monitoring projects

  • Rail monitoring above Energy Australia cable tunnel – Downer Engineering
  • Ground settlement and building monitoring points – Surry Hills and Ultimo – Downer
  • The historic Royal Sydney Golf Course clubhouse extension – Stuarts’ Contracting
  • Elan, Altair and CitiGroup tower building monitoring – Baulderstone Hornibrook Belfinger Berger (BHBB)
  • Eastern Distributor interface – BHBB
  • Redfern rail yard deformation monitoring – Walter Construction
  • Ground Settlement and Building monitoring points – Alexandria and Ultimo – Walter Construction
  • Kings Cross deformation monitoring – BHBB
  • Town Hall north and south real-time deformation monitoring – BHBB
  • St James real-time deformation monitoring – Grocon
  • Telstra Tunnel Sussex Street – BHBB
  • Como slope stability monitoring – RailCorp
  • Lithgow railway boulder monitoring – RailCorp
  • Dowling Street monitoring – Department of Housing
  • Eastern Distributor – Leighton
  • M5 East – BHEgis
  • ARTC rail line deformation surveys – Bega to Casino
  • Boggo Rd Busway Brisbane (Theiss Contractors)
  • Mt Owen Mine Railway (Laing O’Rourke)
  • Douglas Park Bridge (Pells Sullivan Meynink)

Tunnelling projects

  • Elgas Storage Caverns - Walter Construction Group – Sydney
  • M5 East Princess Highway Exit Ramp – BHBB – Sydney
  • M5 East fitout works – Sydney
  • Energy Australia Cable Tunnel – Downer Engineering – Sydney
  • Transgrid Cable Tunnel – Walter Construction Group – Sydney
  • Cross City Tunnel – Sydney
  • Bondi RIAMP Sewerage Treatment Plant tunnel – Sydney
  • Mandalong Mine Drift – Mandalong, NSW
  • Bondi Junction Turnback Project – Sydney
  • EA Tunnel Diversion – BHBB – Sydney
  • Warragamba Deep Storage Solution – BHBB – Sydney
  • Alpurt B2 Tunnel – Auckland, New Zealand (guidance only)
  • North South Bypass Tunnel Brisbane (Leightons Bilfinger Berger JV)
  • City West Cable Tunnel (Theiss Contractors)
  • Desalination Plant Sydney (Bluewater JV)

Road and engineering projects

  • Antienne coal loader project
  • MR184 Windsor Road upgrade – Vineyard, NSW
  • Grade separation of Old Windsor Road/Norwest Boulevarde, Bella Vista, NSW
  • Re-alignment of taxiway golf – Sydney Airport
  • North-West Bus Transitway (Zone 2) – Toongabbie, NSW
  • North-West Bus Transitway (Zone 3) – Kellyville, NSW
  • Asphalt works – M2 Toll Plaza – Marsfield, NSW
  • Asphalt works – F5 widening, Macquarie Links, NSW
  • Asphalt works – Cowpasture Road, Cecil Hills, NSW
  • Liverpool to Parramatta Bus Transitway (Stage 5 and 6) – Wetherill Park, NSW
  • Haviland Park upgrade – Warragamba Dam, NSW
  • Rouse Hill infrastructure upgrade Stage 2, Parklea, NSW
  • Asphalt works – Old Windsor Road, Stanhope Gardens, NSW
  • Asphalt works – General Holmes Drive, Mascot NSW
  • Desalination Plant (Bluewater JV)
  • Tank St Bridge Brisbane (Baulderstone Hornibrook)
  • Karuah-Bulahdelah Bypass (Abigroup Contractors)
  • Coolac Bypass (Abigroup Contractors)
Links
Services

 

All contents © Copyright 2008 | Lynton Surveys | 14/56 O'Riordan Street, Alexandria NSW 2015